Zhongshan Hospital Fudan University
Shanghai, Shanghai Municipality, 200032, China
NCT Number: NCT03451721
To observe the safety and effectiveness of ImageReady™ MR conditional defibrillation system in a Chinese population.
Looking for future studies?
Notify Me18 year and older
All sexes
Interventional
Not applicable
Shanghai, Shanghai Municipality, 200032, China
This is a multi-center, prospective, single-arm study, aimed to observe the safety and effectiveness of ImageReady™ MR conditional defibrillation system in a Chinese population.It will enroll 20 subjects in 5 sites in China.The primary safety endpoint is MR scan-related Complication-free rate between the MR Scan and the MRI + 1 Month Visit. The primary effectiveness endpoints include:1.Abnormal increase in RV shocking impedance from the pre-MR scan to the 1 Month post-MR scan. 2.Increase in RV pacing threshold from the pre-MR scan to the 1 Month post-MR scan. 3.Decrease in RV sensed amplitude from the pre-MR scan to the 1 Month post-MR scan. 4.Increase in LV pacing threshold from the pre-MR scan to the 1 Month post-MR scan. 5.Decrease in LV sensed amplitude from the pre-MR scan to the 1 Month post- MR scan.
Healthy volunteers accepted: No
Only the study team can determine whether someone qualifies for participation.
Inclusion criteria
Exclusion criteria
Subject will receive an ICD or CRT-D pulse generator in the left or right pectoral region ICD
Time frame: MRI + 1 Month Visit(10-13 weeks from 0 day)
The primary safety endpoint of the MR ICD study will be assessed for all subjects who undergo any portion of the study-required MR scan sequences. Safety will be confirmed by evaluating the MR scan related ImageReady System complication-free rate (CFR) between the MR Scan and the MRI Visit + 1 Month.MR scan related ImageReady System complication is relation with ImageReady System and MR Scan.
Time frame: MRI+1 Month visit ( 10~13 weeks from 0 day)
The normal RV shocking impedance measured by the system should be≤200 Ohm, with >200 Ohm considered abnormal. The primary effectiveness endpoint 1 is defined as that the average RV shocking impedance is >200 Ohm at 1 month post scan, while it is ≤ 200 Ohm before scan.There is no hypothesis testing in the MR ICD study, and it can be considered reasonable if up to 2 failed cases of primary effectiveness endpoint 1 occur.
Time frame: MRI+1Month visit( 10~14 weeks from 0 day)
Subjects that have an increase in average RV pacing thresholds ≤ 0.5V (at 0.5 ms) from pre-MR Scan to MRI Visit + 1 Month follow-up will be considered a success, otherwise, it is a primary effectiveness endpoint 2 event.The performance goal of this endpoint for the ENABLE MRI study was 87%. There is no hypothesis testing in the MR ICD study, and it can be considered reasonable if up to 2 failed cases of primary effectiveness endpoint 2 occur.
Time frame: MR+1 Month visit( 10~14 weeks from 0 day)
Subjects will be considered a success if the average sensed amplitude at the MRI + 1 Month Visit remains ≥ 5.0 mV and above 50% of the pre-MR scan value, otherwise, it is a primary effectiveness endpoint 3 event.The performance goal of this endpoint for the ENABLE MRI study was 85%. There is no hypothesis testing in the MR ICD study, and it can be considered reasonable if up to 2 failed cases of primary effectiveness endpoint 3 occur.
Time frame: MR +1 Month visit( 10~14 weeks from 0 day)
Subjects that have an increase in average LV pacing thresholds ≤1.0V (at 0.5 ms) from pre-MR Scan to MRI Visit + 1 Month follow-up will be considered a success, otherwise, it is a primary effectiveness endpoint 4 event.The performance goal of this endpoint for the ENABLE MRI study was 87%. There is no hypothesis testing in the MR ICD study, and it can be considered reasonable if up to 2 failed cases of primary effectiveness endpoint 4 occur.
Time frame: MR +1 Month visit( 10~14 weeks from 0 day)
Subjects will be considered a success if the average sensed amplitude at the MRI + 1 Month Visit remains ≥ 5.0 mV and above 50% of the pre-MR scan value, otherwise, it is a primary effectiveness endpoint 5 event.The performance goal of this endpoint for the ENABLE MRI study was 85%. There is no hypothesis testing in the MR ICD study, and it can be considered reasonable if up to 2 failed cases of primary effectiveness endpoint 5 occur.
Boston Scientific Corporation
Industry
Observation of ImageReady™ MR Conditional Defibrillation System in China (MR ICD)
OpenTrials presents study information sourced from ClinicalTrials.gov. The official registry record should be consulted for the latest information.
View the official ClinicalTrials.gov record (opens in a new tab)This listing is for discovery and informational purposes only. It is not medical advice, does not guarantee that a study is recruiting, and does not determine eligibility. Contact the study team and a qualified healthcare professional when considering participation.
Published trials that share one or more normalized conditions with this study.
NCT07728552
Arrhythmia, Arrhythmias, Cardiac
Seoul, South Korea
View Trial DetailsNCT06381245
Arrhythmia, Arrhythmias, Cardiac
Warsaw, Poland
View Trial DetailsNCT07574931
Ablation of Arrhythmias, Arrhythmia
Cairo, Egypt
View Trial DetailsNCT07118124
Arrhythmia, Arrhythmia in Children
Washington D.C., District of Columbia, United States
View Trial Details